Currently, the Land Public Transport Commission (Suruhanjaya Pengangkutan Awam Darat, SPAD) is organizing the Klang Valley MRT Open Day at Exhibition Hall 3, Mid Valley Convention Centre for 3 months from 14 Feb 2011 - 14 May 2011, open daily from 10am to 9pm.
There, we can see a 40 feet satellite image featuring the proposed alignment of the 51km line consisting of 35 stations running from Sungai Buloh to Kajang, namely The Sungai Buloh-Kajang MRT Railway Scheme .
Beside Mid Valley, the railway scheme is also displayed at the following place for public review during the Klang Valley MRT Open Day period:
- SPAD office
- Bangsar LRT station
- Dewan Bandaraya Kuala Lumpur (DBKL)
- Majlis Bandaraya Shah Alam (MBSA)
- Majlis Bandaraya Petaling Jaya (MBPJ)
- Majlis Perbandaran Kajang (MPKj)
- Majlis Perbandaran Selayang (MPS)
You can click here to download this map in PDF.
From the map, we can see that the proposed 35 stations are:
- Sungai Buloh
- Kg. Baru Sungai Buloh
- RRI
- Kota Damansara
- Taman Industri Sg Buloh
- PJU 5
- Dataran Sunway
- The Curve
- One Utama
- TTDI
- Seksyen 17
- Seksyen 16
- Pusat Bandaraya Damansara
- Semantan
- KL Sentral
- Pasar Seni
- Merdeka
- Bukit Bintang Barat
- Bukit Bintang Timur
- Pasar Rakyat
- Cochrane
- Maluri
- Taman Bukit Ria
- Taman Bukit Mewah
- Leisure Mall
- Plaza Phoenix
- Taman Suntex
- Taman Cuepacs
- Bandar Tun Hussien Onn
- Balakong
- Taman Koperasi
- Taman Mesra
- Saujana Impian
- Bandar Kajang
- Kajang
very good info.
ReplyDeletei'm also sharing for property info nearby MRT
http://mrt-kl.blogspot.com/