Apart from the Light Rail Transit (LRT) extension to Subang Jaya and Puchong area, another hot topic in KL public transport nowadays being the new Klang Valley Mass Rapid Transit (MRT) system from Sungai Buloh to Kajang.
Currently, the Land Public Transport Commission (Suruhanjaya Pengangkutan Awam Darat, SPAD) is organizing the Klang Valley MRT Open Day at Exhibition Hall 3, Mid Valley Convention Centre for 3 months from 14 Feb 2011 - 14 May 2011, open daily from 10am to 9pm.
There, we can see a 40 feet satellite image featuring the proposed alignment of the 51km line consisting of 35 stations running from Sungai Buloh to Kajang, namely The Sungai Buloh-Kajang MRT Railway Scheme .
Beside Mid Valley, the railway scheme is also displayed at the following place for public review during the Klang Valley MRT Open Day period:
- SPAD office
- Bangsar LRT station
- Dewan Bandaraya Kuala Lumpur (DBKL)
- Majlis Bandaraya Shah Alam (MBSA)
- Majlis Bandaraya Petaling Jaya (MBPJ)
- Majlis Perbandaran Kajang (MPKj)
- Majlis Perbandaran Selayang (MPS)
You can click here to download this map in PDF.
From the map, we can see that the proposed 35 stations are:
- Sungai Buloh
- Kg. Baru Sungai Buloh
- RRI
- Kota Damansara
- Taman Industri Sg Buloh
- PJU 5
- Dataran Sunway
- The Curve
- One Utama
- TTDI
- Seksyen 17
- Seksyen 16
- Pusat Bandaraya Damansara
- Semantan
- KL Sentral
- Pasar Seni
- Merdeka
- Bukit Bintang Barat
- Bukit Bintang Timur
- Pasar Rakyat
- Cochrane
- Maluri
- Taman Bukit Ria
- Taman Bukit Mewah
- Leisure Mall
- Plaza Phoenix
- Taman Suntex
- Taman Cuepacs
- Bandar Tun Hussien Onn
- Balakong
- Taman Koperasi
- Taman Mesra
- Saujana Impian
- Bandar Kajang
- Kajang
1 comments:
very good info.
i'm also sharing for property info nearby MRT
http://mrt-kl.blogspot.com/
Post a Comment